twiw-horizontal-trans-150h
Is there a story you think we should be covering? Have a tip on something we should look at?
Contact Us

This Week’s Roadwork in Worcester – Week of July 22, 2019

By Patrick Sargent | July 22, 2019
Last Updated: February 2, 2021

 

  • Ash Street (Green St. to Summit St.) – Water Work
  • Arline Street – Roadway Resurfacing
  • Arlington Street (Winthrop St. to Pattison St.) – Roadway Resurfacing
  • Bangor Street (Grafton St. to Lorenzo St.) – Water Work 
  • Blaine Avenue (Grafton St. to Lorenzo St.)- Sewer Reconstruction
  • Beaver Brook Parkway (Park Ave. to Maywood St.) – Roadway Resurfacing
  • Caroline Street (Grafton St. to Plantation St.) – Roadway Resurfacing
  • Colton Street (Southbridge St. to D St.) – Roadway Resurfacing
  • Commercial Street (MLK Blvd. to Foster St.) – Roadway Resurfacing
  • Crowningshield Road (Houghton St. to Massasoit Rd.) – Roadway Resurfacing
  • Dix Street (Harvard St. to Linden St.)  – Roadway Resurfacing
  • Douglas Street (Cambridge St. to Grand St.) – Roadway Resurfacing
  • Florence Street  (Beaver St. to May St.) – Roadway Resurfacing
  • Greendale Avenue (West Boylston St. to End) – Roadway Resurfacing
  • Hampden Street (West St. to Sever St.) –  Roadway Resurfacing 
  • Harding Street (Canton St. to Arwick St.) – Sewer Reconstruction
  • Hermon Street (Southbridge St. to Larmartine St.) – Sewer Reconstruction
  • Havelock Road (Hadwen Rd. to Maplewood Rd.) – Sewer Reconstruction
  • Lewis Street (Southbridge St. to Princeton St.) – Sewer Reconstruction
  • Madison Street ( at Washington St.) – Water Work 
  • Main Street (Austin St. to School St.) – Roadway Resurfacing
  • Northboro Street (Palfrey St. to Pollock St.) – Water Work
  • Oakwood Lane – Roadway Resurfacing
  • Palfrey Street (Northboro St. to Franklin St.) – Water Work
  • Phillips Street (Marlboro St. to Northboro St.) – Water Work 
  • Pleasant Street (Main St. to Park Ave.) – Roadway Resurfacing
  • Plymouth Street – Water Work
  • Plymouth Street (Green St. to Summit St.) – Sewer Reconstruction 
  • Princeton Street (Southbridge St. to End) – Sewer Reconstruction
  • Providence Strret (Spurr St. to S. of Doane St.) – Roadway Resurfacing
  • Route 20 (Sunderland Rd. and Whitla Dr.) – Sewer Reconstruction
  • Southwest Cutoff (Grafton St. to Greenwood St.) – Water Work
  • Saxon Road (Greenbriar Ln. to St. Paul Dr.) – Roadway Resurfacing
  • Suffield Street (Vernon St. to Perry Ave.) – Roadway Resurfacing
  • Vesper Street (Pleasant St. to High Ridge Rd. – Roadway Resurfacing
  • Walnut Street (Main St. to Chestnut St.) – Roadway Resurfacing
  • Ward Street – Water Work
  • Washington Street (Lamartine St. to Madison St.) – Water Work
  • Washington Street (Larmartine St. to Ash St.) – Sewer Reconstruction
  • Wetherell Street (June St. to Howland Terr.) – Water Work
  • Whipple Street (Blackstone River Rd. to Steele St.) – Sewer Reconstruction
  • Whitla Drive – Sewer Reconstruction


Follow us on The016.com, the social network for Worcester and you!

Recent Headlines

Follow us on The016.com, the social network for Worcester and you!